Imported Indonesian Coal
- Size – 00-50 mm
- GCV (ADB) Upto 5400 to 6200
- GCV (ARB) Upto 3600 to 5000

Imported Indonesian Screen Coal

- Size • 00 -50 mm • 00 – 06 mm • 06 – 20 mm • 20 – 50 mm
- GCV (ADB) Upto 5400 to 6200
- GCV (ARB) Upto 3600 to 5000
- Imported Coal is operated from Magdalla Port, Hazira Port (Gujrat) and PNP / Dharamtal Port (Maharashtra)